Fiyrr Brand Terminal Icon Fiyrr
Video Guide Sign In Request Demo
FI-RFI / RFI.FIYRR.COM

Ball-in-court, always visible. No RFI goes quiet.

Fiyrr RFI & Submittals routes requests for information and submittal packages through their full approval chain, with a live ball-in-court indicator so nobody has to ask "who has this now?"

LiveBall-in-Court Tracking
AutoSchedule Impact Flag
FullApproval Chain History
SHEET — RFI-0142COLUMN GRID C4
RFI-0142 — Column grid clarificationWith Architect
Submittal SUB-0088 — Curtain wall shop dwgApproved
RFI-0139 — MEP routing conflictWith Structural
Submittal SUB-0091 — Rebar mill certsUnder Review
RFI-0135 — Waterproofing detailClosed
FI-RFI / CAPABILITIES

Every request, routed and tracked to closure

RFIs and submittals that show exactly who is holding them up, in real time.

01 / RFI ROUTING

Structured RFIs, linked to the drawing in question

Raise an RFI against a specific sheet and zone, with automatic routing to the right discipline for response.

02 / SUBMITTAL PACKAGES

Shop drawings and product data, one approval chain

Submittal packages move through review with configurable approval stages — no more parallel email threads.

03 / BALL-IN-COURT

Always know who's holding the response

A live indicator shows exactly which party — architect, engineer, contractor — currently owns the next action.

04 / SCHEDULE IMPACT

Overdue responses flagged against the activities they block

RFIs approaching their required-by date are flagged against the schedule activity waiting on the answer.

FI-RFI / WORKFLOW

How an RFI moves from question to answer

A structured path that keeps every party accountable for their turn.

01

Raise against the drawing

An RFI is raised referencing the exact sheet, zone and controlled revision.

02

Route to the right party

The RFI routes automatically to the discipline responsible for the response.

03

Track ball-in-court

Status updates as the RFI moves between reviewer, contractor and design team.

04

Close & log the answer

The closed RFI and its answer are logged permanently against the drawing it referenced.

FI-RFI / CONNECTED

Works with the rest of the suite

RFIs reference the controlled drawing in Document Control and flag risk directly on the Schedule when responses run late.

FI-DOC

Document Control

RFIs and submittals always reference the current controlled revision.

Open module →
FI-SCH

Schedule

Open RFIs are flagged against the activities they're blocking.

Open module →
FI-BIM

Drawings & BIM

Clash-driven RFIs can be raised directly from a model markup.

Open module →
FI-RFI / FAQ

Frequently asked questions

Can approval chains differ by submittal type?

Yes — approval stages are configurable per submittal category, e.g. shop drawings vs. product data.

Does an overdue RFI notify anyone?

Yes — RFIs approaching their required-by date notify the current ball-in-court holder and the project lead.

Can we export an RFI log for the client?

Yes — the full RFI and submittal log exports with status, dates and linked drawings.

See RFI & Submittals on your own project.

We'll load a sample of your drawings, schedule or cost data into the demo.

Request a Demo