Fiyrr Brand Terminal Icon Fiyrr
Video Guide Sign In Request Demo
FI-QS / QS.FIYRR.COM

Inspections closed against the drawing they reference — not a loose checklist.

Fiyrr Quality & Safety turns checklists and safety observations into records tied to the exact location, drawing and activity they concern, so closeout evidence is never separated from the work it describes.

100%Checklists Location-Tagged
LiveOpen Observation Count
FullInspection History
SHEET — QS-05INSPECTION LOG
Rebar inspection — L14 slabPassed
Safety observation — Tower A hoistOpen
Concrete pour checklist — Zone 3Pending
Waterproofing inspection — PodiumPassed
PPE compliance — Site walk2 Findings
FI-QS / CAPABILITIES

Checklists and observations that carry their own context

Every inspection knows which drawing, zone and activity it belongs to.

01 / CHECKLIST LIBRARY

Configurable checklists by trade and activity

Build inspection checklists once per activity type and reuse them across every zone and floor on the project.

02 / SAFETY OBSERVATIONS

Logged on the spot, from a phone

Safety walks capture photo evidence and location instantly, with severity and corrective action tracked to closure.

03 / DRAWING-LINKED FINDINGS

Every finding pinned to its exact location

Inspection results and non-conformances pin directly to the drawing sheet and zone, not a free-text description.

04 / CLOSEOUT EVIDENCE

A clean record for handover and audit

Passed inspections and closed observations compile automatically into the quality record for project handover.

FI-QS / WORKFLOW

How an inspection runs, start to close

From scheduled checklist to closeout evidence, without a paper form in between.

01

Schedule the inspection

Checklists are scheduled against the activity and zone they apply to.

02

Inspect on site

The checklist is completed on a phone or tablet, with photo evidence attached.

03

Raise & assign findings

Any non-conformance is raised as a finding and assigned for correction.

04

Close & compile

Closed items compile into the quality record, ready for handover or audit.

FI-QS / CONNECTED

Works with the rest of the suite

Findings that require rework route straight into Punch List, and every reference points back to the controlled drawing in Document Control.

FI-PCH

Punch List

Failed inspection items convert directly into tracked punch entries.

Open module →
FI-DOC

Document Control

Findings reference the exact controlled drawing revision.

Open module →
FI-FLD

Field Reporting

Safety observations can be logged alongside the daily report.

Open module →
FI-QS / FAQ

Frequently asked questions

Can checklists be customised per project?

Yes — checklist templates are configured per activity type and can be adjusted per project or client requirement.

Do findings notify the responsible party automatically?

Yes — assigned findings notify the responsible subcontractor or supervisor, with due dates tracked to closure.

Can we generate a handover quality file?

Closed inspections and observations compile into an exportable quality record for project handover.

See Quality & Safety Management on your own project.

We'll load a sample of your drawings, schedule or cost data into the demo.

Request a Demo